As an engineering company specialized in nuclear power plants, we can look back on many successful projects. And since nothing is more convincing than success, we present a summary of current and past projects for you here.

If you would like to receive more information, please contact us at info@reinmueller.com

Nuclear Power Plant in Biblis: recurrent tests on the pipe support systems and shock absorbers

  • Client: AREVA NP GmbH
  • Project: “recurrent tests on mobile pipe support systems and shock absorbers”
  • Assessment of the pipe support systems and shock absorbers according to relevant test certificates
  • Database-supported documentation of the plant
  • Inspections in the presence of the expert

Nuclear Power Plant in Biblis: nuclear intermediary cooling system

  • Client: AREVA NP GmbH
  • Project: “rapid stoppage of leaks in the TF system”
  • Planning of the new pipeline systems
  • Generation of the related isometrics with material excerpts and test plans for the construction
  • Preparation of the related drawings of the pipe support system with structural analysis
  • Drawing up of the certificates for the piping components used

Nuclear Power Plant in Biblis: reactor protection monitoring

  • Client: AREVA NP GmbH
  • Project: “repositioning of the reactor protection measurements”
  • Concept research on the topic of “adherence to the protection goals”
  • Planning of the relevant piping systems
  • Generation of the related isometrics with material excerpts
  • Preparation of the related drawings of the pipe support system
  • Construction supervision and coordination of interfaces
  • Acceptance inspections in the presence of the expert

Nuclear Power Plant in Biblis: emergency and residual heat removal system

  • Client: AREVA NP GmbH
  • Project: “fitting of the emergency and residual heat removal system to withstand earthquake”
  • Verification of the support system concept according to the installation guideline
  • Preparation of the pretest documentation for the exchange of the relevant supports for the pipe support system

Nuclear Power Plant in Biblis: special test programs for pipe support systems and shock absorbers

  • Client: AREVA NP GmbH
  • Project: “implementation of the special test programs for mobile pipe support systems and shock absorbers”
  • Documenting of the quantity structure in safety-related system segments
  • Assessment according to relevant test certificates
  • Database-supported documentation
  • Inspections in the presence of the expert

Nuclear Power Plant in Biblis: volume control system and emergency and residual heat removal system

  • Client: AREVA NP GmbH
  • Project: “safety analysis Block A”
  • Generation of pipeline calculations for the emergency and residual heat removal system
  • Generation of pipeline calculations for the volume control system

Nuclear Power Plant in Biblis: volume control system and emergency and residual heat removal system

  • Client: AREVA NP GmbH
  • Project: “as-built documentation and inclusion of stamping space”
  • As-built documentation of the pipeline systems
  • As-built documentation of the related pipe support systems
  • Inspections in the presence of the expert

Nuclear Power Plant Olkilouto 3, Finland

  • Client: AREVA NP GmbH
  • Generation of pipeline calculations
  • Preparation of planning documents in the area of structural engineering
  • Coordination regarding structural engineering
  • Review of planning documents in the area of structural engineering
  • Monitoring and coordination tasks in the area of mechanical engineering

Nuclear Power Plant in Bohunice, Slovakia

  • Client: AREVA NP GmbH
  • Evaluation of the piping systems according to the assessment guideline
  • Monitoring and coordination tasks during realization